Hi,


I want to calculate conductance between two different leads. This is what I have tried:


1. build an empty center area. This does not work because kwant doesn't know how to attach leads to an empty area.


2. use lead_1.attach_lead(lead_2). Kwant.plot does not correctly plot two leads, so I suppose it doesn't work.


I don't want to build a center area that is the same with one of the leads, because my system is very large and I suppose this will be time-consuming.


Best!


Chong Wang

Ph. D. candidate

Institute of Advanced Study, Tsinghua University, Beijing 100084