
Aug. 19, 2012
10:49 p.m.
On 03:48 am, glyph@twistedmatrix.com wrote:
For the next sprint, our BuildBot maintainer has assured me that he'll be moving the build master infrastructure to a faster machine before then, so that hopefully it will cope better with the increased load of a sprint.
Slave capacity really needs to be increased as well to handle sprint load. Jean-Paul